Neoclouds beyond CoreWeave: Nebius, IREN, the miners, Lambda, Crusoe, Nscale and the rest

Last updated: 2026-10-25 · Status: reviewed · Reviewer: Codex (gpt-6-astra) cross-check, applied 2026-10-17 · Author: Claude (claude-fable-5-1 subagent) · Updated 2026-10-21 from signals/2026-10-21.md · Updated 2026-10-25 from signals/2026-10-25.md

Summary

  • The layer has a large financing footprint, but no comparable outstanding-debt total is established here. The cited listed-company figures sum to about $80.7bn including CoreWeave, mixing reporting dates, carrying amounts, principal and project-note subtotals. Later issuance and private facilities require separate drawdown and repayment reconciliations; the former >$110bn headline is withdrawn (row 39). Selective bank access remains open: Nebius disclosed a $3.5bn Citi facility on 22 October; TeraWulf raised committed revolver capacity by about $150m on 23 October. These are capacities, not verified cash draws (rows 7, 56).
  • Major technology buyers anchor substantial commitments. Nscale discloses Microsoft agreements up to $43.8bn; Nebius reports $17.4–19.4bn and IREN $9.7bn. Microsoft, Meta, OpenAI and Anthropic recur across the contracts, but their aggregate share is unmeasured; AMD, Nvidia and other customers also matter. Google support must be distinguished from the lessee's payment obligations (rows 5, 11, 16, 23–24, 29, 33, 47–48).
  • Sampled offers and new contracts show continued demand. Vendor rate cards and Nebius's reported $20–25m/MW annual contract pricing support that narrower conclusion. On 24 October, OCPI settled at $3.02/H100 SXM and $9.57/B200 per GPU-hour, respectively +8.6%/+12.9% over seven days; these indices measure transactions separately from advertised offers (row 55). Nebius's 22-month payback is a forward estimate. Advertised prices, aggregator medians and individual availability flags do not establish fleet-wide realised yields or universal sell-outs; prepayments are material, but no comparable time series establishes a growing share of capex (rows 8, 12–13, 34).
  • Operating performance varies, while returns after capital costs remain unproven. Nebius's Q2 adjusted EBITDA margins were 40.6% for the group and 49.7% for AI cloud, yet OCF less capex was negative $3.41bn. Landlord gross margins and NOI exclude different costs. TeraWulf already had HPC revenue, Cipher began Black Pearl rent in August, and Nscale disclosed a $199.2m H1 adjusted EBITDA loss. These figures do not establish a financially comfortable group or insolvency from debt/ARR alone (rows 2, 15, 18, 20, 22, 24, 40–43, 49–50).
  • The quoted equities have repriced sharply: about 45–70% below their quoted highs, with IREN and Cipher near their stated lows. Share prices in the four cited convertible examples are below the initial conversion prices; the notes retain cash repayment exposure if not converted. FT-reported bond weakness and Gartner's consolidation forecast are contemporaneous evidence, without establishing the cause of the equity moves; consolidation includes acquisitions and does not imply an equivalent default rate (rows 7, 9, 14, 25, 36–38, 51). Elice's 20 October debut fell 32%, closing at 61,500 won versus its 90,500 won offer after raising 201.1bn won/$151m; the reported Firmus investment discussions remain uncompleted and unverified. These add evidence of selective risk appetite, without establishing the same balance-sheet risk across firms (rows 53–54).
  • The biggest uncertainty is how construction, delivery, financing and contract remedies allocate losses. IREN's filings and Nscale's S-1 disclose material conditions, so blanket contract opacity is incorrect. Full deal economics and guarantee coverage remain incomplete; the amounts, activation and duration of each backstop require separate assessment (rows 23, 42–48).

Key claims

# Claim Value As of Source Type Grade
1 Nebius Q2 2026 group revenue; AI cloud ARR $582.3m (+454% YoY); ARR $3.0bn at end-June 2026-Q2 6-K ex99-1, letter primary A
2 Nebius Q2 adj. EBITDA; adj. net loss; capex; operating cash flow $236.2m; $(33.2)m; capex $5,657.4m (H1 $8,130.3m); OCF $2,246.1m, including $1,197.0m net deferred-revenue movement and $1,186.8m receivables release; these movements are not gross prepayments collected 2026-Q2 Q2 statements primary A
3 Nebius cash; total debt; deferred revenue $8.04bn (+$1.06bn restricted); $8.55bn; $5.98bn 2026-06-30 same primary A
4 Nebius customer commitments; expected 2026 prepayments; contracted power target >$40bn; >$9bn; 5 GW by end-2026 2026-08-12 Q2 letter primary A
5 Nebius–Microsoft contract value; Meta #1; Meta #2 $17.4–19.4bn; ~$3bn/5 yr; up to $27bn/5 yr ($12bn dedicated Vera Rubin from early 2027 plus up to $15bn committed purchases of remaining available capacity after Nebius sales to third parties, not a simple discretionary option) 2025-11 / 2026-03 Q3 2025 letter, Meta announcement primary A
6 Nebius 2026 guidance Revenue $3.0–3.4bn; ARR $7–9bn; ~40% adj. EBITDA margin; reaffirmed in Q2 2026-05-13 Q1 letter primary A
7 Nebius 2026 financing and accreted repayment Nvidia $2bn equity; March proposed $3.75bn converts closed at $4.3375bn, the same financing included in Q1; ATM $2.8bn at avg $223.6 (12.7m sh); July $775m secured SOFR+250 to 2030; August $5.75bn converts ($3.45bn 0.50% 2030, conv. $313.46; $2.3bn 4.50% 2034, conv. $324.65), alongside $800m older notes exchanged for shares. Scheduled accreted principal: $3.795bn February 2030 + $2.875bn February 2034 = $6.670bn, before coupons, unless earlier repurchased/redeemed/converted. Signed 17 Oct / disclosed 22 Oct: Citi $3.5bn senior-secured 364-day bridge/term facility, maturity 16 Oct 2027; Term SOFR +2.75%, increasing 0.25pp each 90 days to 3.50% (subject to adjustments), minimum-liquidity covenant and security over substantially all borrower assets with exceptions. Disclosed capacity is not evidence $3.5bn was drawn 2026-03–08 financings / 2026-10-17 agreement, disclosed 2026-10-22 Q1 letter, March closing, July facility, August pricing, August closing, 22 Oct 6-K, Citi facility release primary / derived A terms; B repayment arithmetic
8 Nebius management-reported pricing and estimated payback Q2 deals avg >$20m revenue/MW/yr; four landmark deals $20–25m/MW; first short-term $40–50m/MW deal signed early Q3 for Q4 deployment; estimated payback 1 yr 10 mo (previously 2–3 yrs), based on forecast costs and future capacity; older-GPU pricing up over 30% QoQ; ~70% of Q2 deals included prepayments covering 50–60% of associated capex 2026-Q2 / early Q3 Q2 letter primary A as management attribution; payback outcome unverified
9 Nebius share price $165.47 (−12.2% on day); mkt cap $45.4bn; 52-wk $73.52–299.86; week −18% (FT) / −21% (TipRanks) 2026-10-16 stockanalysis, Dealroom/FT tertiary/secondary B
10 IREN FY26 (to 30 Jun 2026) revenue; AI cloud revenue; adj. EBITDA; net loss $707.0m; $128.8m (Q4 $70.5m); $245.7m; $(702.6)m incl. $638.8m impairments (mining hardware) FY2026 8-K ex99-1 primary A
11 IREN–Microsoft contract ~$9.7bn, 5 yr, GB300, 20% prepayment, Horizon 1–4 (200 MW IT) at Childress; Dell order ~$5.8bn 2025-11-03 8-K ex99-1 primary A
12 IREN ARR: contracted vs operating; pricing Contracted ARR $4bn for 2026 capacity (~85% contracted at Jul); operating ARR ~$1bn at 26 Aug; August release says 2026 capacity largely sold out, with 2027 late-stage customer discussions and 2028 customer/financing discussions in parallel. Recent 3-yr contracts >$20m/MW, discussions ~$25m/MW; ~2-year payback is management's estimate (row 52). 150,000-GPU fleet target; $2.8bn new contracts Jul (Perplexity, Figure, Together, Fluidstack, Fireworks…). Reconfirmed old August disclosures, not a new October contract 2026-08-27 FY26, Jul 8-K, Mar 8-K primary A
13 IREN debt, cash and GPU financing June carrying debt $7,592.944m, principal $7,705.649m; finance leases $243.796m; cash $5,895.591m + restricted $1,723.936m. May $3.0bn 1.00% converts 2033 conv. $73.07; October 2025 $1.0bn 0% converts 2031. August update: $3.6bn Microsoft GPU financing at 6.0% weighted-average interest excluding fees; with prepayments funds 96% of associated GPU capex, with conditional parent recourse (row 47). $2.8bn non-IG financings include Mackenzie $2.4bn at 9.0% fixed, funding 90% of associated GPU capex before prepayments and >100% with them; recent customer prepayments represent 45–55% of GPU capex (row 52). These are 27 August terms, not financing newly raised in October 2026-06-30 balances / 2026-08-27 financing update FY26 results, 10-K primary A
14 IREN share price $26.99 (−11.2%); 52-wk $26.55–76.87 2026-10-16 stockanalysis tertiary B
15 Core Scientific Q2 2026 Revenue $164.2m (colocation $136.7m, 59% GM); adj. EBITDA $41.1m; net loss $(1,155)m (warrant FV $1,046m); capex $797.5m; cash $1.77bn 2026-Q2 PR primary A
16 Core Scientific contracts CoreWeave ~590 MW, $10bn+ TCV, ~$850m annualised, 12-yr; AMD ~530 MW/5 sites 15-yr, $14bn+, option to 2.5 GW; total ~1.1 GW, $24bn+; 437 MW billing mid-July (~$635m annualised); build capex $11–12m/MW 2026-07-28 deck, AMD PR primary A
17 Core Scientific debt $4.385bn principal versus $4.297967bn carrying debt: $3.3bn 7.75% secured notes 2031 (CoreWeave rent in lockbox), $460m 3% converts 2029 and $625m 0% converts 2031; separate $600m RCF/LC announced August, not June outstanding debt 2026-06-30 balances / 2026-08-27 facility 10-Q, RCF primary A
18 Applied Digital FQ1 2027 (to 31 Aug 2026) Revenue $341.9m (HPC $262.6m: base rent $65.8m, fit-out $183.5m); adj. EBITDA $64.4m; HPC NOI $58.829m / base rent $65.8m = 89.4%, excluding major group costs; continuing-operations loss attributable to common shareholders $(221.0)m, $(237.1)m including discontinued operations; cash including restricted ~$3.7bn; debt $6,376.592m; previously cited capex not independently verified in this release 2026-08-31 October 7 results and reconciliation primary / derived A stated results; B NOI ratio; capex unverified
19 Applied Digital leases and financing 1.41 GW leased; $36bn base-term ($86bn with renewals); Polaris Forge 1 → CoreWeave (250 MW live); PF2/PF3/Delta Forge 1–2 → unnamed IG hyperscaler (DF2 210 MW, $5.2bn); $1.59bn 7.0% secured notes 2031 via ComputeCo 3 2026-10 same, notes, DF2 primary A
20 Cipher Digital Q2 2026 Mining revenue $24.837m; net loss $(267.529)m; adj. EBITDA $(29.986)m; interest $66.736m; cash $831.829m unrestricted + $3,727.958m restricted. Deck debt $6.016bn (secured $4.543bn); statement carrying borrowings $5.541350bn ($94.484m short-term + $5,446.866m long-term), a different measure 2026-Q2 Q2 statements, business update primary / derived A reported measures; B carrying-borrowings sum
21 Cipher contracts and project debt 3 leases ~700 MW, ~$11.4bn, NOI ~$793m/yr; Barber Lake (Fluidstack) extended 10→20 yrs, $3.8bn→>$9bn, new term with "leading AI lab"; project notes $1.733bn 7.125% (amortisation tied to Fluidstack rent + Google backstop, Ba3/BB-), $2.0bn 6.125% (Ba2), $810m 6.0%; $850m 0% converts 2032 conv. $15.31 (Oct 2026) 2026-10-14 same, Barber Lake, converts primary A
22 TeraWulf Q2 2026 Revenue $44.8m (HPC $31.932m, ~71% of total); adj. EBITDA $(18.3)m; net loss $(940.827)m (warrant revaluation $755.667m); unrestricted cash ~$2.62bn, including restricted $3.028608bn; debt components total $5.213112bn (converts ~$2.1bn, other debt ~$3.1bn); previously cited H1 capex not independently verified in this release 2026-Q2 Q2 results primary / derived A stated results; B debt/share sums; capex unverified
56 TeraWulf secured revolver amendment — capacity, not draws Committed capacity $250m→approximately $400m (about $150m added); separate approximately $150m uncommitted accordion requires additional lender commitments and other conditions. Prior $150m letter-of-credit sublimit removed. The amendment does not establish a funded draw or $550m of committed capacity; no new outstanding balance disclosed 2026-10-23 amendment / filing; re-fetched 2026-10-25 Issuer-hosted 8-K, Item 1.01 primary A disclosed terms; draw unestablished
23 TeraWulf contracts and Google support scope Anthropic 20-yr ~401 MW, ~$19bn (up to ~$33bn), first delivery 2H 2027 / full delivery early 2028. FY25 >$12.8bn lease total included 50.1% Abernathy interest, not only Lake Mariner (Fluidstack 380 MW + Core42 60 MW). Previously disclosed Google support: $3.2bn Lake Mariner; separate $1.3bn Abernathy. Q2 $600m was a tranche becoming effective. Sale of 50.1% Abernathy interest for ~$530m payable in installments changes retained exposure; warrants issued to Google, not owned Google warrants 2025-11–2026-08 Q3 2025, FY25, Anthropic / disposal, Q2 primary A
24 Hut 8 Q2 2026 and subsequent portfolio Revenue $74.9m; adj. EBITDA $10.4m excluding digital-asset marks, $(94.6)m including marks; net loss $(177.1)m. Portfolio including July lease: 949 MW / $26.6bn base-term / >$1.75bn expected annual NOI; River Bend 245 MW Fluidstack $7.0bn, Google-backed; Beacon Point 2×352 MW $19.6bn to AA- or higher tenant. $7.5bn nonrecourse project notes ($3.25bn 6.192% 2042; $4.25bn 6.129% 2042) are a project subtotal, not total group debt. September $1.07bn parent RCF undrawn at closing (row 44) 2026-Q2 / July portfolio / September RCF Q2, Beacon notes, RCF 8-K primary A
25 Miner share prices CORZ $13.48 (52-wk 12.31–30.46); APLD $18.05 (17.65–50.73); CIFR $8.98 (8.78–30.14); WULF $11.68 (10.35–29.84); HUT $67.75 (31.67–140.80); all −7% to −11% on the day 2026-10-16 stockanalysis pages (CORZ, APLD, CIFR, WULF, HUT) tertiary B
26 Lambda financing $1.008bn 6.78% fixed DDTL to May 2033, A(low)/Baa1, JPM-arranged, secured on GPUs + contracted cash flows from two IG offtakers; delayed draws fund commissioned deployments, not all cash received at closing; $926m TLB (Aug 2026); $1bn secured facility (May 2026); >$1.5bn equity from TWG/USIT (Nov 2025); Microsoft "multibillion-dollar" multi-year deal (Nov 2025), value undisclosed 2026-10-01 Lambda, investors primary A
27 Lambda pre-IPO Talks on ~$3bn at ≥$12bn (Bloomberg, 24 Aug 2026); no S-1 on file; IPO "possibly next year" 2026-08-25 Techerati secondary C (reported, unverified)
28 Crusoe Series F $3.9bn at $30.9bn post (Atreides/Mubadala/Valor; Nvidia, GIC, QIA); 1 GW operational, 6 GW+ contracted, $140bn+ TCV; Abilene 1.2 GW (Oracle/OpenAI) + 900 MW for Microsoft → 2.1 GW; Childress 1 GW with Lancium 2026-09-22 Series F, Childress, w.media primary/secondary A/B
29 Nscale commercial footprint and financing Historical Microsoft ~200,000 GB300 announcement; Series C $2bn at $14.6bn (March). September $3.36bn converts: $2.36bn initial closing, Nvidia $1bn expected mid-November. S-1: $103.4bn active/contracted TCV, of which $2.6bn active, at August 31; Microsoft up to $43.8bn and Anthropic up to $44.6bn, conditional on delivery/service. Facilities: $1.4bn GPU DDTL, $790m Norway, $900m RCF, August DDTLs up to $3.05bn ($1.85bn Ward County + $1.2bn Madison); commitments are not drawn balances 2026-08-31 TCV / September disclosures 2025 Microsoft, Series C, converts, August DDTLs, September 18 S-1 primary A stated terms; B facility addition
30 Together AI; Voltage Park/Lightning; Vultr Together $800m Series C at $8.3bn, bookings >$1.15bn, 500 MW+ commitments; Voltage Park 36,000+ GPUs, ARR $18m→$500m+; Vultr $3.5bn valuation (Dec 2024), ~$329m bank debt (2025), $1bn Ohio AMD cluster 2026-07 Together, TechCrunch, Voltage Park, Wikipedia/Vultr mixed B/C
31 Fluidstack reported private financing $750m at $7bn (April, Telegraph); reported $1.5bn at >$18bn (September, Forbes). Secondary $1.8bn Google support figure cannot be used as a current layer total: disclosed project support in rows 23 and 48 has different scope 2026-09 Dealroom summary secondary C reported, unverified; D as aggregate backstop
32 Gulf: Humain; G42/Core42 Humain target 1.9 GW by 2030, 6.6 GW later; $23bn US-vendor agreements; CEO cites $77bn total cost; G42 authorised for 35,000 Blackwell-equivalent exports (Nov 2025), UAE moved to Country Group A:5 (Jul 2026); Core42 $550m financing 2025-08 / 2026-07 RCR, Wikipedia/G42 secondary/tertiary C
33 Microsoft neocloud commitments: historical report versus current named ceilings November 2025 >$60bn report is not reconstructed by its named components: historical Nscale ~$23bn + Nebius $17.4–19.4bn + IREN $9.7bn = $50.1–52.1bn, Lambda unspecified. Replacing Nscale with S-1 up-to-$43.8bn gives $70.9–72.9bn across the three; conditional contract ceilings across different disclosure dates, not earned revenue or the November snapshot 2025-11 report / 2026-09 filing Introl citing Bloomberg, Nscale S-1, Nebius, IREN primary / derived / tertiary A primary ceilings; B sums; C historical report, unverified
34 Advertised GPU rates and aggregator snapshots Vendor H100 cards: Nebius $4.50/hr, Lambda SXM $3.99–4.29, Crusoe $4.50; B200 Nebius $8.50, Lambda $6.69–6.99. Review retrieval: H100 median $3.49 (flat 90 d), B200 $7.95 (+4% 90 d); later application fetch: $3.86 / $7.99. Weekly page: H100 $3.51 / +18% YoY; B200 +19% YoY not independently reproduced. Aggregator availability differs by PCIe/SXM; no primary blanket sell-out confirmation or realised-price series 2026-10-17 retrievals; weekly page week of October 12 Nebius, Lambda, Crusoe, H100 index, B200 index, weekly trends primary rate cards / tertiary aggregator A vendor cards; D aggregator observations
35 Underwriting vs spot (bear case) GPU-backed debt sized at ~$7–8/hr H100 at 2024 peak vs ~$2.99 spot; >$176bn GPU-collateralised infrastructure; dominant lenders Blackstone, Blue Owl, Apollo, PIMCO, BlackRock 2026-05-19 Compute Forecast tertiary D
36 Data-centre bond marks reported by FT Indexed FT syndication: Hut 8 Louisiana ~93c / Texas ~91c (Nvidia tenant per FT); QTS Excalibur <87c; Hyperion/Beignet <91c; CoreWeave <75c / nearly 16% yield; Oracle Michigan 88c. Security identifiers, trade timestamps and primary transaction records not verified 2026-10-15 FT, Yahoo FT syndication, indexed excerpts secondary C reported, unverified; former Dealroom-only chain D
37 Gartner forecast and market scope >80% of neoclouds cease independent operation by 2030, including consolidation. AI data-center owners broadly need cumulative $8.5tn revenue through 2030 versus forecast ≤$3.6tn attributable revenue, covering announced capex, financing and assumed 12% ROIC. >$3.5tn impairment exposure by 2030, >$4tn through 2032. AI-optimized IaaS market $66bn (2027) → $174bn (2030), not neocloud-only revenue 2026-10-14 Gartner primary release primary A for Gartner's stated forecast, not outcome
38 CoreWeave (cross-ref) Q2 revenue $2.575bn; RPO $103.7bn; carrying debt $35.068bn ($31.405bn recourse), versus principal $35.551bn; Customer A 36%/B 26%/C 10%; $3.7bn 2.875% converts 2033 conv. $97.85 (Sep); 2031/2032 notes ~14.8–14.9% yield in earlier October coverage; later CNBC snapshots: 9.625% 2032 YTM 14.9% on 19 Oct and 9.75% 2031 YTM 15.97% on 20 Oct. Five-year CDS ~1,082bp on 19 Oct / nearly 1,081bp on 20 Oct; 21 Oct 1,065.84bp per CNBC/FactSet, reported 22 Oct, fixing time unspecified; snapshots, not synchronized closes. S&P B+ 2026-06-30 financials / September issue / 2026-10-19–21 credit snapshots 10-Q, converts, investingLive/CNBC, CNBC 19 Oct, CNBC 20 Oct, CNBC 22 Oct / FactSet primary/secondary A primary financials/terms; B market-report attribution, C quoted marks
39 Debt aggregation audit; no comparable layer outstanding-debt total Legacy listed-seven inputs sum to $45.641bn; including rounded CoreWeave $35.1bn gives $80.741bn (~$80.7bn). Mixed June/August dates, principal/carrying values and Hut project-note subtotal. Gross later converts total $10.300bn, but adding them is not a reconciled current balance: Nebius July +$0.775bn financing and August −$0.800bn exchange must also be tracked, alongside other draws/repayments. Nscale announced facilities/converts sum to $9.500bn and Lambda facilities $2.934bn; neither is verified outstanding debt. No >$110bn total is established; Crusoe JV debt remains unverified 2026-10-17 audit of mixed dates Rows 3, 13, 17–18, 20, 22, 24, 26, 29, 38; Nebius exchange; CSV derived B arithmetic only; D as homogeneous June/current debt total
40 Nebius profitability and cash arithmetic Group margin 236.2/582.3 = 40.56%; AI cloud 285.7/574.9 = 49.70%; OCF less capex 2,246.1−5,657.4 = −$3,411.3m; capex/revenue 9.72×. Deferred-revenue movement is 53.29% of OCF; subtracting it alone leaves $1,049.1m but does not normalize the $1,186.8m receivables release 2026-Q2 statements, segments derived B
41 Nscale disclosed H1 financials Revenue $140.6m; operating loss $(492.0)m; adj. EBITDA $(199.2)m; net loss $(1,020.1)m, including $457.1m fair-value losses. Operating losses persist beyond the fair-value charge 2026-H1; filed 2026-09-18 S-1, primary filing mirrored primary A
42 Nscale Anthropic financing and contract conditions Up-to-$44.6bn agreements require financing and satisfaction of delivery/service obligations; no binding commitments for required financing as of the prospectus. Disclosed termination rights and remedies matter. This is a September 18 statement, not a verified October 17 financing status 2026-09-18 S-1, risk factors and customers primary A
43 Cipher construction obligations and rent commencement Barber Lake amendment: phased delivery Q4 2026–Q1 2027; Cipher bears first $359.3m above budget; tenant reimburses 50% of further overruns as additional rent over 20 years. Business update states Black Pearl first capacity delivered and rent commenced in August 2026-09-25 amendment; August rent per Q2 update Barber Lake amendment, business update primary A
44 Hut 8 parent revolver and liquidity covenant $1.07bn senior secured RCF, parent borrower, subsidiary guarantees / asset security; zero outstanding at September 24 closing. Quarterly minimum liquidity begins March 31, 2027: 40% of commitments before stabilization, 25% thereafter, subject to qualifications and equity cure rights 2026-09-24 8-K primary A
45 Announced financing versus cash received Nscale: $2.36bn initial convertible tranche closed; Nvidia $1bn expected mid-November 2026. Lambda: $1.008bn delayed-draw term loan funds as clusters enter service; full commitment is not disclosed as current debt/cash received 2026-09-25 / 2026-10-01 Nscale, Lambda primary A
46 TeraWulf Muskie power expansion Electric service agreement raises contracted utility capacity from 500 MW to 1 GW; first 500 MW targeted to ramp in 2028, second 500 MW in 2029, subject to regulatory approval / utility construction. Prospective power, not additional executed lease revenue 2026-10-05 Muskie release primary A
47 IREN public remedies, parent recourse and Nvidia customer Microsoft 8-K discloses delivery acceptance, deadlines, cure periods, termination rights and delay credits. 10-K: conditional parent guarantee after valid funded-tranche termination and unsuccessful remarketing, net of GPU disposition proceeds, plus potential upfront-payment refund exposure; guarantee has tranche releases. Separate five-year Nvidia cloud contract ~$3.4bn 2025-11-03 terms / 2026-06-30 guarantees / 2026-05-07 Nvidia Microsoft 8-K, 10-K guarantees, Nvidia agreement primary A
48 Cipher initial Google support and warrant direction Initial Barber Lake agreement disclosed $1.4bn Google support for Fluidstack obligations and warrants issued to Google for ~24m Cipher shares (~5.4% pro forma), subject to adjustments / potential cash settlement. This does not establish coverage of the later extended lease term 2025-09-25; extended 2026-09-25 original agreement, extension primary A
49 Landlord warrants are own-equity liabilities CORZ warrants are exercisable into CORZ common stock and carried as warrant liabilities; TeraWulf issued own-equity warrants to Google, not a portfolio of Google warrants. Cipher Q2 warrant revaluation loss $150.510m / net loss $267.529m = 56.26%; TeraWulf $755.667m / $940.827m = 80.32%; noncash revaluations are not cash burn 2026-Q2 CORZ warrant note, TeraWulf warrant disclosure, TeraWulf results, Cipher results primary / derived A classification and amounts; B loss shares
50 Nebius depreciation estimate and comparability Server/network useful lives extended from four to five years prospectively from Q1 2026. Adjusted EBITDA excludes depreciation entirely; this measure alone cannot establish returns after hardware replacement costs 2026-Q1 accounting change Q1 letter, non-GAAP definition primary A
51 Equity drawdowns and cited convertible comparisons CRWV quoted close $61.39 / 52-week high $150.40; other quote inputs in rows 9, 14 and 25. Using quoted closes/highs: NBIS 44.82%, IREN 64.89%, CORZ 55.75%, APLD 64.42%, CIFR 70.21%, WULF 60.86%, HUT 51.88%, CRWV 59.18% below highs (range 44.8–70.2%). IREN $26.99 > $26.55 low; CIFR $8.98 > $8.78 low. IREN/NBIS/CIFR/CRWV spots 63.06%/47.21%/41.35%/37.26% below cited initial strikes; four examples, not every 2026 issue 2026-10-16 closes; arithmetic applied 2026-10-17 Rows 7, 9, 13–14, 21, 25, 38; quote inputs, CRWV and sibling pages derived from quoted market data B conditional arithmetic; quote inputs not independently primary-verified by cross-check
52 IREN payback and funding basis — old context reconfirmed August estimate of ~2-year payback divides estimated GPU/ancillary capex by contracted revenue less estimated direct costs; it is not realized project cash recovery. Recent contractual prepayments are 45–55% of estimated GPU/ancillary capex, with no assurance future contracts include them; GPU capex excludes provincial sales tax/GST. Microsoft 6.0% is weighted interest excluding fees, not an all-in borrowing cost. Coverage ratios in row 13 apply to associated GPU capex, not total datacenter capex 2026-08-27 disclosure; re-fetched 2026-10-21; not new since 17 Oct SEC-filed FY26 results and footnotes 3–5, issuer release, fetch restricted primary management terms/estimates A for disclosed terms/basis; payback outcome unverified
53 Elice IPO risk appetite Reported 32% debut fall on 20 Oct: 61,500 won close versus 90,500 won offer; 201.1bn won/$151m raised. New listing-price observation; does not establish CoreWeave-like balance-sheet risk or a distressed credit event 2026-10-20; reporting re-fetched 2026-10-21 The Next Web citing Bloomberg/Reuters and issuer filing secondary; underlying filing/trade data not independently retrieved B reported prices/filing figures
54 Firmus financing context Nvidia investment talks reported after withdrawn IPO; no completed transaction or amount verified. IPO withdrawal predates 17 October 2026-10-20 report; restricted original re-fetched 2026-10-21 The Information, headline accessible; body restricted, verification and novelty audit secondary private-company report C reported, unverified; re-fetch confirms headline only
55 OCPI transaction-price observations, distinct from rate cards H100 SXM $2.78 on 17 Oct → $3.12/GPU-hour on 20 Oct (20 Oct: +4.7% day/−1.6% week/+17.7% month); B200 $8.48 → $8.83 (+5.0%/+12.8%/+14.5%). Additional dated settlements 21 / 22 / 23 / 24 Oct: H100 $3.09 / $3.15 / $3.17 / $3.02; B200 $9.40 / $9.32 / $9.58 / $9.57 per GPU-hour. At 24 Oct: H100 +8.6% 7d / +3.4% 30d, B200 +12.9% / +19.5%. Publisher daily index settlements, not every provider's rent, utilization or collateral value. Not spliced into row 34's advertised-price observations 2026-10-17–24 settlements; 21–24 Oct history re-fetched 2026-10-25 Ornn H100, Ornn B200, existing daily archive primary index publisher A displayed settlements; representativeness not independently audited
57 Silicon Data H100 dated display versus FAQ Neo-cloud SDH100RT card $2.88/GPU-hour dated 24 Oct, versus same page’s undated FAQ $2.53. Prefer the dated display while preserving the conflict. Publisher-dated Saturday observation, retrieved retrospectively; neither complete-month coverage nor same-day publication freshness is established 2026-10-24 publisher date; fetched 2026-10-25 Silicon Data publisher page primary publisher display A dated display; C freshness/coverage suitability
58 Supplier view of neocloud demand and capital Huang’s 22 Oct CNBC interview describes very strong neocloud demand constrained by scarce working capital and European power allocation; expects the capital constraint to be solved. Attributed supplier opinion and prognosis, not a new quantified order or bank commitment 2026-10-22 interview; full body fetched 2026-10-25 CNBC interview reporting secondary attribution B attribution; C prognosis

Type: primary / secondary / tertiary. Grade: A–D (see report/methodology.md).

Analysis

What the layer is. GPU clouds own servers and sell compute; converted miners increasingly lease powered shells; sovereign vehicles add a third financing model. Shared customers connect the layers: Core Scientific's secured notes depend on CoreWeave rent, while CoreWeave itself needs customer collections (rows 17, 38). The CSV is an inventory of differently measured exposures, not a consolidated balance sheet: its cited listed figures total about $80.7bn including CoreWeave, with incompatible dates and debt bases (row 39). Private commitments cannot simply be added to outstanding public debt.

Profitability and cash. Nebius's Q2 group adjusted EBITDA margin was 40.6%, while AI cloud earned 49.7%. OCF benefited from both deferred-revenue and receivables movements; the former is not gross prepayment collections. OCF less capex was negative $3.41bn, and capex was 9.72 times quarterly revenue (rows 2, 40). Its extension of server/network useful lives from four to five years affects accounting depreciation; adjusted EBITDA excludes that cost entirely (row 50). IREN's $4bn contracted versus ~$1bn operating ARR leaves a $3bn commissioning gap, rather than implying all contracted capacity is uncommissioned; ARR also includes ancillary services and assumptions, and debt/ARR is not debt-service coverage (rows 10, 12–13). The landlord metrics do not support a common comfort ranking: CORZ's approximately 59% colocation gross margin and APLD's 89.4% NOI on base rent measure different cost layers, before major group financing and capital costs. APLD's continuing-operations loss attributable to common shareholders was $221.0m; its fit-out revenue is not recurring rent (rows 15, 18). Hut's $10.4m adjusted EBITDA excludes digital-asset marks; including them it was negative $94.6m, and major AI deliveries remained prospective (row 24). TeraWulf already earned HPC revenue in Q2, and Cipher's business update says Black Pearl rent began in August (rows 22, 43). Their warrant charges are mostly noncash and do not directly measure burn (row 49). Nscale's public filing adds substantial operating and adjusted EBITDA losses to the comparison; it is no longer correct to say all private names disclose no margins (row 41).

How it is financed. Rated, secured, amortising facilities coexist with convertibles and equity issuance: Lambda, IREN and Nscale report contract-backed facilities, while Hut finances individual projects with nonrecourse bonds (rows 13, 24, 26, 29). These are distinct obligors and securities, not a layer-wide credit rating. IREN's Microsoft financing includes conditional parent recourse after qualifying termination and failed remarketing; Hut's separate parent revolver introduces secured parent obligations and a minimum-liquidity covenant even though it was undrawn at closing (rows 44, 47). Lambda's new facility draws against commissioning, and Nscale's Nvidia tranche was expected in November: neither full announcement is current cash received (row 45). Nebius’s Citi bridge and TeraWulf’s expanded revolver show selective new bank capacity despite market stress; their announced limits do not establish cash received. Nebius’s short maturity, increasing margin and minimum-liquidity covenant introduce refinancing and liquidity tests alongside that access (rows 7, 56). Nebius's March financing was counted twice in the draft; its August financing also exchanged older debt for equity (row 7). Share prices in the four cited convertible examples are below their initial conversion prices. The notes are already debt and retain cash repayment exposure if not converted. Nebius's two August series have different accreted maturities, $3.795bn in 2030 and $2.875bn in 2034 before coupons (rows 7, 51). Customer prepayments are material financing, with possible refund obligations; the observations do not establish a rising layer-wide time series (rows 8, 13, 47).

Customer concentration and contract conditions. Microsoft, Meta, OpenAI and Anthropic recur across large commitments, without a quantified denominator for “almost all.” Nscale's current Microsoft ceiling raises the three named Microsoft contract figures to $70.9–72.9bn, subject to conditions and disclosure dates; this is not earned revenue. AMD's Core Scientific partnership and Nvidia's IREN contract are material additional relationships (rows 16, 33, 47). Meta's up-to-$15bn residual-capacity commitment supports Nebius after sales to other customers; those sales cannot also be counted as additive Meta revenue (row 5). Nscale disclosed no binding financing commitments for its Anthropic agreements at its prospectus date, alongside delivery, service and termination conditions; the September statement should not be projected unchanged into October (row 42). IREN's public delivery, cure, termination and refund provisions likewise refute blanket opacity (row 47). At Cipher, higher Barber Lake nominal TCV comes with phased delivery and substantial overrun funding before reimbursement over the lease term (row 43). Google support is larger than the draft implied, but its project scope, activation and duration matter: TeraWulf's Lake Mariner support differs from the disposed Abernathy interest, and Cipher's original support does not establish full extended-term coverage (rows 23, 48).

A possible stress transmission, not a universal loss order. A demand pause could depress merchant rental yields, reduce new contracting and weaken collateral or refinancing. Which channel binds first depends on delivery obligations, liquidity, maturities, covenants and guarantees. Landlords also bear construction risk before rent begins, as Cipher illustrates (row 43); prospective Muskie power adds future development optionality rather than delivered lease revenue (row 46). CORZ and TeraWulf carry liabilities for warrants on their own equity, not portfolios of the alleged counterparty warrants (row 49). Equity dilution, convertible repayment, GPU-loan recovery and project-bond recovery must be modeled by obligor; guarantees may pay before bondholders suffer losses. There is no demonstrated sequence in which backstop providers always lose after creditors. FT-reported bond weakness is evidence of repricing, with marks unverified against primary trade records (row 36). Nvidia's Nscale investment was still expected, not funded, at the September announcement (row 45).

Pricing and aggregate returns. Management-reported new contracts and vendor rate cards show continuing demand in the sample (rows 8, 12, 34). Nebius's short-term premium deal was signed in early Q3; its 22-month payback is estimated from future costs and capacity. Mixed aggregator snapshots and model-specific availability cannot establish universal sell-outs, realised fleet yields or independently reproducible annual price changes. A spot quote below a median is not inherently contradictory; row 35 remains a weak tertiary underwriting claim. Gartner's cumulative revenue requirement concerns AI data-center owners broadly, and its IaaS forecast is not neocloud-only; loss of independence includes consolidation (row 37). Healthy sampled offers can coexist with inadequate returns after replacement capex, financing and dilution. Construction and financing remain the stronger evidenced concerns than an established broad rental-price collapse.

CoreWeave is covered in research/stack/coreweave.md. Here it matters as a major borrower and as the tenant behind CORZ and APLD rent streams (rows 17, 19, 38). Its quoted credit stress is a reported indicator; a covenant breach at another borrower requires evidence from the applicable agreement.

Conflicts and open questions

  • 25 October financing and pricing counterevidence. The weak Elice debut and Firmus talks in the prior update do not imply that bank access closed across the layer: Nebius’s newly disclosed Citi facility and TeraWulf’s revolver expansion demonstrate selective access, while exposing security, liquidity and refinancing obligations rather than proving funded cash or profitable returns (rows 7, 56). The 24 October OCPI prints also remain inconsistent with a broad rental-price-collapse claim. Silicon Data’s dated $2.88 card disagrees with its same-page $2.53 FAQ; the dated display is retained separately from OCPI, with weekend/publication-coverage limits explicit (rows 55, 57). Huang’s capital-scarcity view is supplier opinion, not a measured financing gap (row 58).

  • 21 October funding and pricing update. Elice's weak 20 October debut and the restricted Firmus funding report qualify continuing-funding evidence in the Summary; neither overturns verified IREN/Lambda/Nscale facilities or proves financing closed across the layer. The IREN figures re-fetched on 21 October were published on 27 August, and its estimated payback omits costs beyond its stated denominator. The new OCPI settlements show rising B200 rents alongside a weaker H100 seven-day change; they do not substantiate a universal rental-price collapse or supersede the different list-price series (rows 12–13, 52–55). The signals log's Breakingviews link returned an unrelated Australian M&A article on re-fetch and is not independent corroboration of Firmus.

  • Profitability judgement. The original note called Nebius and selected landlords “comfortable” and IREN/Cipher/TeraWulf “overextended.” The cross-check finds the split directionally plausible but the ranking unreliable: segment EBITDA, gross margin and NOI omit different costs, while commissioning gaps and debt/ARR do not establish insolvency. This revision retains the delivery and financing concern but leaves comfort after replacement capex, interest and dilution unproven (rows 18, 24, 40–41, 50).

  • Pricing judgement and changing snapshots. The original note inferred a sold-out market and reconciled the bearish spot claim with an asserted historical rebound. The reviewer supports continued demand only for sampled offers and contracts; neither the rebound narrative nor fleet yields is established. Its retrieved H100/B200 medians were $3.49/$7.95, versus $3.86/$7.99 on the later application fetch, while the weekly page gives H100 $3.51. These are different observations, not a verified price series; neither a below-median spot quote nor model-specific availability resolves market-wide stress (rows 34–35).

  • Contract-firmness judgement. The draft called almost all exposure dependent on four buyers, treated terms as wholly undisclosed and described Meta's residual capacity as simply optional. The reviewer finds concentration substantial but unquantified, with AMD, Nvidia and other customers omitted from that framing. The cross-check gives more weight to Meta's committed residual purchases and IREN/Nscale public remedies; it is also more concerned by Nscale's disclosed financing conditions. Corrected structures are recorded in rows 5, 42 and 47. Full economics, redactions and later financing updates still need deal-specific checks. Contracted TCV, renewal-inclusive potential revenue and operating ARR must remain separate; only part of IREN's contracted ARR is already operating.

  • Backstop scope and loss allocation. The original concern was that Google support might cover only initial tranches, accompanied by a proposed equity-to-lenders-to-guarantors crash sequence. The reviewer assigns more weight to disclosed support and rejects a universal creditor waterfall. Lake Mariner's disclosed $3.2bn support, separate $1.3bn historical Abernathy support and Cipher's initial $1.4bn cannot be combined into the draft's $1.8bn layer total; retained exposure after disposal, amortization and extended-term coverage remain open (rows 23, 48). Guarantee calls may precede creditor losses; covenant and recovery analysis is still required.

  • Debt headline and funding appetite. The draft presented a homogeneous June/current debt total and read new convertible issuance as stress. The reviewer sees a large footprint but mixed measures and dates, unverified private drawdowns, and continuing rated funding as counterevidence to a one-way crash narrative. Row 39 preserves the arithmetic audit without presenting it as current outstanding debt; row 45 separates delayed funding. Issue terms and uses of proceeds are needed to judge whether new funding relieves or exposes stress.

  • Bond marks and event causality. The draft's FT chain gave Hut 94/92c, Excalibur <88c, Hyperion <92c, CoreWeave <80c/~15% and Oracle Michigan 87c; the review's indexed FT syndication gives 93/91c, <87c, <91c, <75c/nearly 16% and 88c. Row 36 uses the latter, graded C, reported/unverified; version or timing differences remain unresolved without security identifiers and trade timestamps. The draft identified FT/Gartner as proximate causes of the equity sell-off; the reviewer finds contemporaneous coverage insufficient to establish causation.

  • Gartner's meaning. The original narrative leaned toward failure across the layer; the cross-check distinguishes consolidation and loss of independence from defaults, and the broader infrastructure revenue requirement from neocloud-only revenue. Gartner's own forecast is primary evidence of its model, not validation of the forecast or an independently reproducible model here (row 37).

  • Unverified capex. The reviewer did not locate the draft's APLD and TeraWulf capex claims in their cited releases. Those figures are excluded from the comparison rather than retained at grade A (rows 18, 22).

  • Unnamed tenants. APLD's non-CoreWeave campuses, Hut's Beacon Point tenant (Nvidia per unverified FT reporting), Nebius's secured-facility counterparty and Lambda's offtakers limit concentration measurement (rows 7, 19, 24, 26, 36). Public descriptions of credit quality do not identify ultimate end-users.

  • Crusoe financing and Lambda valuation. Crusoe's Abilene JV debt remains unverified and excluded from totals. Lambda's pre-IPO valuation and timing remain reported, unverified (rows 27–28, 39).

Signals to watch

Signal Current value As of Source Next check / date Why it matters
Nebius conversion prices and cash maturities Spot $165.47 vs initial $313.46/$324.65; scheduled accreted principal $3.795bn in 2030 / $2.875bn in 2034, before coupons 2026-10-16 spot / August terms rows 7, 9 February 2030 / February 2034 contractual repayments If not converted, cash repayment exposure remains; the two series mature separately
IREN operating ARR vs contracted ARR ~$1bn vs $4bn; $3bn gap; August disclosure says 2026 largely sold out; no fresh operating-ARR observation established on 21 Oct 2026-08-26/27; reconfirmed 2026-10-21 rows 12, 52 Next issuer results; date not independently verified in this pass Commissioning and collections, not bookings alone, must service financing
Advertised GPU prices and realised yields OCPI H100 SXM $3.02/B200 $9.57 per GPU-hour (7d +8.6%/+12.9%); Silicon Data dated H100 $2.88 conflicts with undated FAQ $2.53. Retain 17 Oct aggregator $3.49/$7.95 and later $3.86/$7.99 as separate list-price observations 2026-10-24 benchmark dates; fetched 2026-10-25; 2026-10-17 list observations rows 34, 55, 57 Next publisher-dated settlement after 24 Oct, 4pm ET; no 25 Oct settled print displayed Track comparable configurations and realised collections before inferring market-wide price changes
Hut / QTS / Hyperion reported project-bond prices ~93/91c / <87c / <91c; reported, unverified 2026-10-15 row 36 Next dated security-specific mark; no fixed publication date Wider yields can raise financing costs; no universal 90-cent issuance cutoff is established
CoreWeave reported unsecured yields and CDS 19 Oct 9.625% 2032 YTM 14.9%; 20 Oct 9.75% 2031 YTM 15.97%; 21 Oct five-year CDS 1,065.84bp, fixing time unspecified. Retain earlier 15 Oct ~14.8–14.9%/nearly 16% yield reports as distinct security/time snapshots 2026-10-19–21; earlier 2026-10-15 rows 36, 38 Next dated bond/CDS observation; security and fixing time required Tenant credit affects landlord risk; security and timestamp are needed to compare marks
New contracts, delivery and construction costs Cipher Barber Lake +$5.2bn nominal TCV; phased Q4 2026–Q1 2027 delivery; first $359.3m above budget borne by Cipher 2026-09-25 rows 21, 43 Q4 2026–Q1 2027 phased delivery Additional contracted revenue carries near-term cash and execution obligations
Financing commitments versus funding Nebius $3.5bn Citi capacity; TeraWulf ~$400m committed revolver plus ~$150m uncommitted accordion; neither establishes new cash draws. Earlier Lambda $1.008bn DDTL draws with commissioning; Nscale $2.36bn closed / Nvidia $1bn expected mid-November Nebius disclosed 2026-10-22 / TeraWulf 2026-10-23; earlier 2026-09-25 / 2026-10-01 rows 7, 26, 45, 56 Next draw/liquidity disclosure; Nebius maturity 16 Oct 2027; Nscale Nvidia tranche expected mid-November 2026 Rated facilities show lender appetite, while undrawn or future tranches are not current cash
New convertible issuance NBIS $5.75bn, CRWV $3.7bn, CIFR $0.85bn; Nscale announced $3.36bn with split funding 2026-10-14 latest cited issue rows 7, 21, 29, 38, 45 Next issuer financing disclosure; no verified date Assess terms, maturities, use of proceeds and retirements before interpreting issuance as stress
Delivered capacity versus prospective power CORZ AMD ~530 MW contracted; TeraWulf Muskie 1 GW utility capacity, second 500 MW targeted 2029 2026-10-05 rows 16, 46 Muskie first 500 MW in 2028 / second in 2029, targets Signed leases, energized power and billable capacity are distinct milestones
Prepayment financing IREN 45–55%; Microsoft financing + prepayments covers 96% of associated GPU capex; Mackenzie 90% before and >100% with prepayments. Nebius 50–60% on associated deals, >$9bn 2026 expectation 2026-08 disclosures; IREN reconfirmed 2026-10-21 rows 4, 8, 13, 52 Next delivery/collection disclosure; no verified release date Track delivery and refund obligations; no comparable series proves a rising share
Ratings, covenants and parent recourse CoreWeave B+; Nebius Citi minimum-liquidity covenant / asset security; Hut parent RCF undrawn at closing, liquidity tests from March 2027; IREN conditional guarantee Nebius disclosure 2026-10-22; Hut 2026-09-24 rows 7, 38, 44, 47 Nebius next liquidity disclosure; Hut minimum-liquidity tests begin 31 Mar 2027 A rating change is not an automatic breach without an applicable covenant; liquidity and recourse differ by borrower
Nscale Anthropic financing No binding required-financing commitments at prospectus date; subsequent status not verified here 2026-09-18 row 42 Next financing disclosure; date unannounced in verified sources Check later funding and delivery updates before treating TCV as secured future cash flow
Named tenants and backstop scope Several offtakers unnamed; initial Google support disclosed with project-specific limits 2026-10-17 review rows 19, 23–24, 26, 48 Next agreement/filing; no verified date Ultimate concentration and loss allocation require identification, term and activation detail
IREN contracted pipeline August disclosure: 2027 late-stage customer discussions; 2028 customer/financing discussions in parallel; no new October contracts verified here 2026-08-27; re-fetched 2026-10-21 row 12 2027/2028 delivery cohorts; next issuer update date unverified Discussions and largely sold-out 2026 capacity are not newly delivered or collected revenue
Neocloud equity funding appetite Elice 20 Oct debut −32%, 61,500 won versus 90,500 won offer; Firmus Nvidia funding report remains unverified talks 2026-10-20 reports; checked 2026-10-21 rows 53–54 Next exchange filing or funding close; no confirmed date Weak aftermarket demand and proposed private funding test different channels; neither proves financing closed for all firms
Major-buyer earnings and capex Microsoft, Alphabet and Amazon results remain future at cutoff; no new results adopted 2026-10-25 schedule check Microsoft, Alphabet issuer notice, Amazon Microsoft / Alphabet 28 Oct (Alphabet call 4:30pm ET); Amazon 29 Oct, 5pm ET Buyer spending and collections underpin neocloud contracts; previews are not results
FOMC financing environment October decision remains future 2026-10-25 schedule check Federal Reserve calendar 27–28 Oct meeting Base rates affect floating-rate secured facilities and refinancing
CoreWeave tenant covenant transition Unlimited equity cures permitted prior to 28 Oct; then at most three consecutive calendar months in four; first DSCR test 31 Oct 2027 31 Dec 2025 agreement; re-fetched 2026-10-25, old terms 2 Jan 8-K 28 Oct 2026 cure-rule transition Tenant credit affects CORZ/APLD; transition is not automatic default or a debt maturity

Sources

Sources 1–81 accessed 2026-10-17. Sources 82–87 re-fetched or attempted 2026-10-21; sources 88–97 re-fetched 2026-10-25. Access limits are stated below. SEC requests used the generic User-Agent research-bot [email protected].

  1. Nebius Group, Form 6-K Exhibit 99.1, Q2 2026 results, 2026-08-12. https://www.sec.gov/Archives/edgar/data/1513845/000110465926094568/tm2622968d1_ex99-1.htm

  2. Nebius Group, Form 6-K Exhibit 99.2, Q2 2026 shareholder letter, 2026-08-12. https://www.sec.gov/Archives/edgar/data/1513845/000110465926094568/tm2622968d1_ex99-2.htm

  3. Nebius Group, Form 6-K Exhibit 99.2, Q1 2026 shareholder letter, 2026-05-13. https://www.sec.gov/Archives/edgar/data/1513845/000110465926059872/tm2614392d1_ex99-2.htm

  4. Nebius Group, Form 6-K Exhibit 99.2, Q3 2025 shareholder letter, 2025-11-12. https://www.sec.gov/Archives/edgar/data/1513845/000110465925109806/tm2530882d1_ex99-2.htm

  5. Nebius Group, Form 6-K Exhibit 99.1, Meta agreement, 2026-03-16. https://www.sec.gov/Archives/edgar/data/1513845/000110465926027886/tm268879d1_ex99-1.htm

  6. Nebius Group, Form 6-K Exhibit 99.1, Microsoft agreement, 2025-09-08. https://www.sec.gov/Archives/edgar/data/1513845/000110465925088312/tm2525580d1_ex99-1.htm

  7. Nebius Group, Form 6-K Exhibit 99.1, FY2025 results, 2026-02-12. https://www.sec.gov/Archives/edgar/data/1513845/000110465926013946/tm266173d1_ex99-1.htm

  8. Nebius Group, Form 6-K Exhibit 99.1, convertible notes pricing, 2026-08-20. https://www.sec.gov/Archives/edgar/data/1513845/000110465926098924/tm2623617d1_ex99-1.htm

  9. Nebius Group, Form 6-K Exhibit 99.1, closing of $4.3375bn convertible notes, 2026-03-20. https://www.sec.gov/Archives/edgar/data/1513845/000110465926032735/tm268409d4_ex99-1.htm

  10. Nebius, press release, closing of $5.75bn convertible notes, 2026-08-24. https://nebius.com/newsroom/nebius-group-announces-closing-of-private-offering-of-convertible-senior-notes-with-aggregate-gross-proceeds-of-approximately-5-75-billion

  11. Nebius, press release, $775m secured debt financing, 2026-07-17. https://nebius.com/newsroom/nebius-raises-775-million-in-first-secured-debt-financing-to-accelerate-global-buildout

  12. Nebius, press release, infrastructure-partnership business model, 2026-07-15. https://nebius.com/newsroom/nebius-introduces-business-model-to-scale-ai-cloud-globally-through-infrastructure-partnerships

  13. Nebius, GPU price list. https://nebius.com/prices

  14. IREN, Form 8-K Exhibit 99.1, FY26 results, 2026-08-27. https://www.sec.gov/Archives/edgar/data/1878848/000187884826000051/irenreportsfy26results.htm

  15. IREN, Form 8-K Exhibit 99.1, $2.8bn new contracts and ARR target, 2026-07-20. https://www.sec.gov/Archives/edgar/data/1878848/000114036126028871/ef20078253_ex99-1.htm

  16. IREN, Form 8-K, 1.00% convertible notes due 2033, 2026-05-14. https://www.sec.gov/Archives/edgar/data/1878848/000114036126021285/ef20073507_8k.htm

  17. IREN, Form 8-K Exhibit 99.1, 50,000+ B300 purchase, 2026-03-04. https://www.sec.gov/Archives/edgar/data/1878848/000114036126007905/ny20064909x3_ex99-1.htm

  18. IREN, Form 8-K Exhibit 99.1, Microsoft $9.7bn contract, 2025-11-03. https://www.sec.gov/Archives/edgar/data/1878848/000114036125040072/ef20058139_ex99-1.htm

  19. IREN, Form 8-K Exhibit 99.1, $1.0bn 0% convertible notes due 2031, 2025-10-14. https://www.sec.gov/Archives/edgar/data/1878848/000114036125038083/ef20056955_ex99-1.htm

  20. Core Scientific, press release, Q2 2026 results, 2026-07-28. https://investors.corescientific.com/news-events/press-releases/detail/139/core-scientific-announces-second-quarter-2026-results

  21. Core Scientific, Q2 2026 earnings deck, 2026-07-28. https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001839341-26-000012/q2fy26earningsdeck728am.htm

  22. Core Scientific, Form 10-Q, quarter ended 2026-06-30, filed 2026-07-28. https://www.sec.gov/Archives/edgar/data/1839341/000183934126000014/core-20260630.htm

  23. Core Scientific, press release, AMD infrastructure partnership, 2026-07-28. https://investors.corescientific.com/news-events/press-releases/detail/138/core-scientific-and-amd-announce-infrastructure-partnership

  24. Core Scientific, press release, $600m senior secured credit facilities, 2026-08-27. https://investors.corescientific.com/news-events/press-releases/detail/143/core-scientific-secures-600-million-of-senior-secured-credit-facilities

  25. Applied Digital, press release, fiscal Q1 2027 results, 2026-10-07. https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results

  26. Applied Digital, press release, $1.59bn 7.000% senior secured notes, 2026-06-09. https://ir.applieddigital.com/news-events/press-releases/detail/156/applied-digital-announces-pricing-of-1-59-billion-of

  27. Applied Digital, press release, 210 MW Delta Forge 2 lease, 2026-06-08. https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2

  28. Cipher Digital, Form 8-K Exhibit 99.1, Q2 2026 results, 2026-08-04. https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm

  29. Cipher Digital, Form 8-K Exhibit 99.2, Q2 2026 business update, 2026-08-04. https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm

  30. Cipher Digital, Form 8-K Exhibit 99.1, Barber Lake lease amendment, 2026-09-25. https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm

  31. Cipher Digital, Form 8-K Exhibit 99.1, $850m 0% convertible notes due 2032, 2026-10-14. https://www.sec.gov/Archives/edgar/data/1819989/000119312526421035/d77312dex991.htm

  32. TeraWulf, press release, Q2 2026 results, 2026-08-05. https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results

  33. TeraWulf, press release, Anthropic lease and Abernathy sale, 2026-07-06. https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack

  34. TeraWulf, press release, Q4 and FY2025 results, 2026-02-26. https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results

  35. TeraWulf, Form 10-Q, quarter ended 2026-03-31. https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm

  36. Hut 8, Form 8-K Exhibit 99.1, Q2 2026 results, 2026-08-04. https://www.sec.gov/Archives/edgar/data/1964789/000110465926090041/tm2621890d1_ex99-1.htm

  37. Hut 8, Form 8-K Exhibit 99.1, Q4/FY2025 results, 2026-02-25. https://www.sec.gov/Archives/edgar/data/1964789/000110465926019393/hut-20260225xex99d1.htm

  38. Hut 8, Form 8-K Exhibit 99.1, Beacon Point $4.25bn 6.129% notes, 2026-06-04. https://www.sec.gov/Archives/edgar/data/0001964789/000110465926070744/tm2616926d1_ex99-1.htm

  39. Hut 8, Form 8-K Exhibit 99.1, Beacon Point Phase 2 lease, 2026-07-20. https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm

  40. Hut 8, Form 8-K, $1.07bn revolving credit agreement, 2026-09-28. https://www.sec.gov/Archives/edgar/data/1964789/000110465926111154/tm2625691d1_8k.htm

  41. Lambda, blog, $1bn senior secured fixed-rate financing, 2026-10-01. https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-fixed-rate-financing

  42. Lambda, investors page (financing history, Microsoft agreement). https://lambda.ai/investors

  43. Lambda, GPU price list. https://lambda.ai/pricing

  44. Techerati, "Lambda's £2.1bn pre-IPO talks put neoclouds back into focus" (citing Bloomberg), 2026-08-25. https://www.techerati.com/news-hub/lambdas-2-1bn-pre-ipo-talks-put-neoclouds-back-into-focus/

  45. Crusoe, press release, $3.9bn Series F, 2026-09-22. https://www.crusoe.ai/resources/newsroom/crusoe-announces-series-f-funding

  46. Crusoe, press release, 1 GW Childress campus with Lancium, 2026-07-15. https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas

  47. W.Media, "Microsoft to add 900 MW to AI campus in Abilene, Texas", 2026-03-30. https://w.media/microsoft-to-add-900-mw-to-ai-campus-in-abilene-texas/

  48. Nscale, press release, Microsoft ~200,000 GB300 contract, 2025-10-15. https://www.nscale.com/press-releases/nscale-microsoft-2025

  49. Nscale, press release, $2bn Series C at $14.6bn, 2026-03-09. https://www.nscale.com/press-releases/nscale-series-c

  50. Nscale, press release, $3.36bn pre-IPO convertible financing, 2026-09-25. https://www.nscale.com/press-releases/pre-ipo-convertible-financing

  51. Nscale, press release, $1.4bn GPU-backed delayed draw term loan, 2026-02-12. https://www.nscale.com/press-releases/nscale-signs-1-4bn-delayed-draw-term-loan

  52. Nscale, press release, ~$3bn delayed draw term loans, 2026-08-31. https://www.nscale.com/press-releases/nscale-3-billion-delayed-draw-term-loans

  53. Together AI, blog, $800m Series C, 2026-07-01. https://www.together.ai/blog/announcing-our-series-c

  54. TechCrunch, "Neocloud Together AI raises $800M, leaps to $8.3B valuation", 2026-07-01. https://techcrunch.com/2026/07/01/neocloud-together-ai-raises-800m-leaps-to-8-3b-valuation

  55. Voltage Park, blog, Lightning AI merger, 2026-01. https://www.voltagepark.com/blog/lightning-ai-voltage-park-merger-to-create-the-first-cloud-built-for-ai

  56. Wikipedia, "Vultr" (citing WSJ, CNBC, Bloomberg). https://en.wikipedia.org/wiki/Vultr

  57. Dealroom, "Fluidstack raises $750m at $7bn" (citing The Telegraph, WSJ), 2026-04-06. https://dealroom.co/news/127233-fluidstack-raises-750m-at-7b-as-google-and-anthropic-anchor-its-ai-data/

  58. RCR Wireless, "Humain to launch DCs with US chips in early 2026", 2025-08-26. https://www.rcrwireless.com/20250826/ai-infrastructure/humain-dcs

  59. Wikipedia, "G42 (company)" (citing Reuters, Bloomberg, DCD). https://en.wikipedia.org/wiki/G42_(company)

  60. Introl, "Microsoft's $60B Neocloud Bet" (citing Bloomberg 2025-11-04), 2025-12-12. https://introl.com/blog/microsoft-60-billion-neocloud-spending-2025

  61. getdeploying.com, NVIDIA H100 cloud price index. https://getdeploying.com/gpus/nvidia-h100

  62. getdeploying.com, NVIDIA B200 cloud price index. https://getdeploying.com/gpus/nvidia-b200

  63. getdeploying.com, GPU rental price trends. https://getdeploying.com/gpu-price-trends

  64. Compute Forecast, "The private credit bet on GPU infrastructure…", 2026-05-19. https://www.computeforecast.com/long-reads/private-credit-gpu-infrastructure-risk-neocloud-debt-2026/

  65. Financial Times, Michelle Chan, Ian Smith, Ramsay Hodgson, Tim Bradshaw and Euan Healy, "Investors dump data centre bonds as AI borrowers face ‘Darwin moment’", 2026-10-15; indexed Yahoo syndication (reported marks, not primary trade verification). https://finance.yahoo.com/markets/stocks/articles/investors-dump-data-centre-bonds-132608292.html Original: https://www.ft.com/content/678bcd31-6c2a-447b-a68c-ce6dec220bbc

  66. heise online, "Forecast: 80 percent of neoclouds cease operations by 2030", 2026-10-14. https://www.heise.de/en/news/Forecast-80-percent-of-neoclouds-cease-operations-by-2030-11487979.html

  67. Gartner, press release, "Over $3.5 trillion of AI infrastructure spending could be exposed to impairment by the end of 2030", 2026-10-14 (primary release fetched in cross-check/application). https://www.gartner.com/en/newsroom/press-releases/2026-10-14-gartner-says-over-us-dollars-three-and-a-half-trillion-of-artificial-intelligence-infrastructure-spending-could-be-exposed-to-impairment-by-the-end-of-2030

  68. CoreWeave, Form 10-Q, quarter ended 2026-06-30, filed 2026-08-12. https://www.sec.gov/Archives/edgar/data/1769628/000176962826000366/crwv-20260630.htm

  69. CoreWeave, Form 8-K Exhibit 99.1, $3.7bn 2.875% convertible notes pricing, 2026-09-22. https://www.sec.gov/Archives/edgar/data/1769628/000176962826000432/ex991pricing.htm

  70. investingLive (citing CNBC), "CoreWeave bonds trade like distressed debt", 2026-10-15. https://investinglive.com/stocks/coreweave-bonds-trade-like-distressed-debt-as-ai-spending-outpaces-balance-sheets/

  71. stockanalysis.com quote pages for NBIS, IREN, CRWV, CORZ, APLD, CIFR, WULF, HUT (closes of 2026-10-16). https://stockanalysis.com/stocks/nbis/ and siblings

  72. Wikipedia, "CoreWeave" (citing Reuters, FT, Bloomberg, Forbes). https://en.wikipedia.org/wiki/CoreWeave

  73. Wikipedia, "Stargate LLC" (citing Commercial Observer, Reuters). https://en.wikipedia.org/wiki/Stargate_LLC

  74. Nscale, Form S-1, filed 2026-09-18, financials, TCV and customer/financing conditions; full primary HTML fetched from Fast Edgar mirror; SEC accession index. https://archive.fast-edgar.com/20260918/A82LC22FZZ2R89ZK22ZC2ZYQJ8SJZZ22Z28Q/ Index: https://www.sec.gov/Archives/edgar/data/2110365/000119312526395475/0001193125-26-395475-index.html

  75. IREN, Form 10-K, year ended 2026-06-30, debt and parent-guarantee disclosures. https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm

  76. IREN, Form 8-K, Microsoft and Dell agreements, 2025-11-03. https://www.sec.gov/Archives/edgar/data/1878848/000114036125040072/ef20058139_8k.htm

  77. IREN, issuer press release, Nvidia $3.4bn cloud contract, 2026-05-07. https://www.globenewswire.com/news-release/2026/05/07/3290760/0/en/iren-secures-3-4bn-ai-cloud-contract-with-nvidia.html

  78. Cipher Mining, issuer release, original Fluidstack agreement and $1.4bn Google support, 2025-09-25. https://investors.cipherdigital.com/news-releases/news-release-details/cipher-mining-signs-168-mw-10-year-ai-hosting-agreement

  79. TeraWulf, issuer release, Q3 2025 results and Google support, 2025-11-10. https://investors.terawulf.com/news-events/press-releases/detail/126/terawulf-reports-third-quarter-2025-results

  80. TeraWulf, Form 8-K Exhibit 99.1, Muskie power expansion, 2026-10-05. https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-064757/muskieexpansionpr.htm

  81. Crusoe, GPU price card, live page observed 2026-10-17. https://www.crusoe.ai/cloud/pricing

  82. IREN, issuer FY26 results, 2026-08-27; IR page returned 403 on 2026-10-21. The matching SEC exhibit (source 14) was re-fetched successfully with a generic User-Agent and confirms the financing/pricing terms and estimate footnotes. https://iren.gcs-web.com/news-releases/news-release-details/iren-reports-fy26-results

  83. The Next Web, Elice IPO report, 2026-10-20; full body re-fetched, citing Bloomberg/Reuters and the issuer filing; underlying filing and exchange tape not independently retrieved. https://thenextweb.com/news/elice-ipo-32-percent-debut-korea-ai-data-centre-neocloud

  84. The Information, Firmus funding report, 2026-10-20 per the signals verification; restricted original exposes the headline only. No investment close or amount established. https://www.theinformation.com/articles/nvidia-moves-back-gpu-cloud-provider-firmus-investors-balk-ipo

  85. Ornn, OCPI-H100 and OCPI-B200 publisher histories and 20 October settlements; re-fetched 2026-10-21. https://data.ornn.com/markets/h100-sxm and https://data.ornn.com/markets/b200

  86. CNBC, CoreWeave/Oracle credit observations, 2026-10-19 (updated 20 October); full AMP body fetched directly on 2026-10-21. https://www.cnbc.com/amp/2026/10/19/coreweave-oracle-ai-credit-stress.html

  87. CNBC, CoreWeave bond/John Lloyd reporting, 2026-10-20; full AMP body fetched directly on 2026-10-21. https://www.cnbc.com/amp/2026/10/20/coreweave-debt-janus-henderson-lloyd.html

  88. Nebius, Form 6-K, signed 17 October facility disclosed 22 October 2026; full primary HTML re-fetched successfully 2026-10-25. https://www.sec.gov/Archives/edgar/data/1513845/000110465926117978/tm2628078d1_6k.htm

  89. Nebius, “Nebius secures $3.5 billion financing facility with Citi,” 2026-10-22; accessed 2026-10-25. https://nebius.com/newsroom/nebius-secures-3-5-billion-financing-facility-with-citi

  90. TeraWulf, Form 8-K, revolver amendment, 2026-10-23; full issuer-hosted primary filing accessed 2026-10-25. https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-067100/wulf-20261023.htm

  91. Ornn, OCPI H100/B200 publisher histories through 24 October; re-fetched 2026-10-25. https://data.ornn.com/markets/h100-sxm and https://data.ornn.com/markets/b200

  92. Silicon Data, H100 Rental Price Index, card dated 2026-10-24 and contradictory undated FAQ; accessed 2026-10-25. https://www.silicondata.com/products/silicon-index/h100

  93. CNBC, “AI debt and French bonds stress test,” 2026-10-22, reporting FactSet 21 October CDS snapshots; web tool restricted, full direct HTML fetched 2026-10-25. https://www.cnbc.com/2026/10/22/ai-debt-and-french-bonds-stress-test.html

  94. CNBC, “Nvidia CEO Jensen Huang says neocloud demand is ‘off the charts’,” 2026-10-22; web tool restricted, full direct HTML fetched 2026-10-25. https://www.cnbc.com/2026/10/22/nvidia-jensen-huang-neocloud-demand-capital.html

  95. Microsoft, FY2027 Q1 earnings event; Alphabet, company-issued 6 October Q3 conference-call notice syndicated unedited by Publicnow/MarketScreener; Amazon, Q3 earnings schedule. All re-fetched 2026-10-25. https://www.microsoft.com/en-us/investor/events/fy-2027/earnings-fy-2027-q1 ; https://www.marketscreener.com/news/alphabet-announces-date-of-third-quarter-2026-financial-results-conference-call-ce785dd9dc89f62d ; https://www.aboutamazon.com/news/company-news/amazon-earnings-q3-2026-report

  96. Federal Reserve, FOMC meeting calendar, October 27–28 2026; accessed 2026-10-25. https://www.federalreserve.gov/monetarypolicy/fomccalendars.htm

  97. CoreWeave, Form 8-K filed 2026-01-02, describing 31 December 2025 covenant amendment; primary HTML re-fetched 2026-10-25, old terms retained only as upcoming watch. https://www.sec.gov/Archives/edgar/data/1769628/000176962826000003/crwv-20251231.htm